Case Study: Sempra

Working with Structuretone on behalf of Sempra, Hills carried out a Cat B fit out on Level 5 of 155 Bishopsgate.


Client: Sempra Trading
Main Contractor: Structuretone
Electrical Consultant: GDP Simon Green
Value: £1.1m


Hills carried out the fit out for Structuretone and delivered a defects free project as per the programme.

As the end users sector is trading we had to install an uninterrupted power system and Main Equipment Room all supported by UPS and PDU systems. General lighting was installed and controlled by an intelligent system and emergency lighting monitoring provided. 

All materials were delivered to a Consolidation Site and delivered out of hours due to access limitations.


Works included:

  • Main Switchgear
  • UPSs
  • PDUs
  • MER Room
  • General Lighting and Power
  • Lighting Control and Emergency monitoring
  • Underfloor busbar and desk power
  • Fire Alarm Systems
  • Security/CCTV

Sempra